Chaise Pool Lounge Chairs Set of 2, Outdoor Sun Tanning Chairs, Reclining Back, Steel Frame and Side Pocket, Black

$131.97

  • – For two people to tan or lounge around the pool together on
  • – Back reclines to 5 different positions to find the perfect tanning angle
  • – Adjustable sunshade to protect your eyes from intense sunlight
  • – Breathable oxford fabric is quick-drying, and breathable to stay cool in summer
  • – Load-bearing, water-safe powder-coated steel

In stock

Free Shipping

On Every Order

Easy Returns

30-Day Policy

1-Year Warranty

Limited Coverage

Secure Checkout

SSL Protected

Description

Wish you could pack up the comfort of the resort and bring it with you on the road? You’re one-step closer. has a pair of foldable lounge chairs so you and a friend lay back in the sun at the beach, camping, or the pool. They feature reclining backrests with five positions, and a sunshade to protect your eyes; pick the perfect tanning angle and get the most out of your summer snooze. Made with summer in mind, their breathable oxford surface keeps cool for when you need them.

Features:

  • – For two people to tan or lounge around the pool together on
  • – Back reclines to 5 different positions to find the perfect tanning angle
  • – Adjustable sunshade to protect your eyes from intense sunlight
  • – Breathable oxford fabric is quick-drying, and breathable to stay cool in summer
  • – Load-bearing, water-safe powder-coated steel
  • – Foldable design to make transport easy
  • – Ideal for garden, balcony, swimming pool, or beach
  • – Just need to install canopy

Specification:

  • – Color: Black, Black Matte Frame
  • – Materials: Steel, Oxford Fabric
  • – Fully Reclined Dimensions: 22″ W x 74.75″ D x 11″ H
  • – Folded Dimensions: 27.5″ L x 22″ W x 5″ H
  • – Seat Dimensions: 22″ W x 47.25″ D x 11″ H
  • – Backrest Dimensions: 27.5″ L x 22″ W
  • – Adjustable Back Angle: 180°, 160°, 140°, 120°, 100°
  • – Backrest Height to Ground: 11″, 16.5″, 23.5″, 28.25″, 33.5″ H
  • – Weight Capacity: 265 lbs.
  • – Net Weight: 23 lbs.

Package Includes:

  • – 2 x Sun Lounger
  • – 1 x Manual
Shipping

Fast & Free Shipping

Enjoy free shipping on every order within the contiguous United States. Most orders leave our trusted warehouse partners within 1–2 business days. Once your order ships, we’ll email your tracking information so you can follow its journey.

What to Expect

✓
Free shipping on every order
↗
Orders typically ship within 1–2 business days
◷
Estimated delivery in 3–7 business days for most locations
✉
Tracking information emailed as soon as your order ships

Questions About Delivery?

Need your order by a specific date? Contact our support team before ordering, and we’ll gladly help confirm product availability and the estimated delivery timeframe.

Warranty & Returns

30-Day Returns

Most unused items may be returned within 30 days of delivery.

 

Warranty Coverage

Many products include a manufacturer’s warranty. Coverage varies by product.

 

Need Assistance?

Contact us for help with damaged items, missing parts, or warranty claims.

 

Reviews (0)
0 reviews
0
0
0
0
0

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Why EverPlay

Why Shop With EverPlay Outdoors?

✓ Free Shipping on Every Order
✓ Secure Checkout & Trusted Payments
✓ Carefully Curated Outdoor Products
✓ Fast Order Processing
✓ Tracking Updates on Every Shipment
✓ Friendly U.S.-Based Customer Support

We carefully select quality outdoor products that help families relax, play, entertain, and create lasting memories. From your first click to final delivery, we’re committed to making your shopping experience simple, reliable, and enjoyable.